Builder Quote Comparison Checklist

Line up two or three renovation quotes item by item before you decide which one is the best fit.

0 / 14 completed

Licence and insurance

Scope

Price

Payments

Contract

Use this checklist when you have two or three written quotes and need to work out which one is the best fit for your project, not simply the lowest number. Quotes for the same renovation often differ because they price different things: one includes demolition and skip bins, another assumes you will arrange them; one has a $3,000 provisional sum for tiling that looks cheap until the real tiles cost $7,000.

How to use it. Tick each item for each quote. Any unticked item is either a risk or a cost you will need to add yourself. Ask the builder to fill the gap in writing before you compare prices.

Worked example (illustrative). Quote A is $52,000 including GST and covers demolition, waste and a $4,000 tile allowance. Quote B is $47,000 but excludes waste removal (say $1,500) and allows only $2,000 for tiles you expect to cost $4,000. Adjusted, Quote B is $47,000 + $1,500 + $2,000 = $50,500, much closer than it first looked.

Limits. The checklist does not tell you whether a builder is good. Check the licence register, ask for addresses of completed jobs you can look at from the street, and read the contract before you sign. See how to compare builder quotes for the full method.

Related guides