Renovation project types compared

How common Australian renovation projects differ in scope, approvals, cost drivers and risk.

This table compares project types, not builders or prices. Use it to understand which approvals, trades and risks come with each kind of work before you ask for quotes. Cost notes are qualitative; for illustrative dollar ranges use the renovation cost estimator and read the guide for each project.

Select a column header to sort.

Project typeTypical scopeApprovals usually involvedMain cost driversWatch out for
Cosmetic refreshPaint, flooring, lighting, joinery doors, minor repairsUsually none, unless strata by-laws or heritage controls applyArea, prep work, product choiceLead paint in older homes; electrical work still needs a licensed electrician
Kitchen renovationCabinetry, benchtops, appliances, splashback, plumbing and electricalOften none for like-for-like; structural or layout changes may need approvalCabinetry and benchtop material, moving plumbing, appliance packageLow prime cost allowances; walls removed without engineering
Bathroom renovationStrip-out, waterproofing, tiling, fixtures, ventilationUsually none for like-for-like; strata approval common in apartmentsNumber of trades per m², waterproofing, tile and fixture choiceWaterproofing done by unlicensed workers; hidden water damage
Ground-floor extensionNew rooms, slab or subfloor, roof tie-in, servicesDevelopment approval or complying development plus building approvalFootings, roof junction, glazing, kitchen or bathroom in the extensionSite classification surprises; stormwater and boundary setbacks
Second-storey additionNew upper floor, stairs, structural upgrade belowDevelopment and building approval almost alwaysStructural engineering, temporary roofing, scaffolding, stairsMoving out for months; existing frame not able to carry the load
Granny flat / secondary dwellingSelf-contained small dwelling on the same lotState-specific pathways; some states have streamlined approval for small secondary dwellingsServices connections, slab, kitchen and bathroom fit-outRules on renting it out, council contributions and separate metering
Knock-down rebuildDemolition and a new house on the same blockDemolition approval plus full new-dwelling approvalsDemolition, site costs, house size and designTemporary housing costs and longer timeframes
Full refurbishmentSeveral rooms at once, often with rewiring and replumbingDepends on structural and external changesNumber of wet areas, rewiring, structural repairsScope creep; living on site during works

Approval pathways and thresholds differ by state and by council. Check your state planning portal (for example the NSW Planning Portal, Planning Victoria or the Queensland planning system) and your local council before relying on any row. Builder licensing, contract and insurance rules are summarised in renovation rules by state. Roofing, heating and cooling, solar, leak repairs and window replacement are covered only briefly here.